One-off services and list prices
Every price includes the lab analysis the service needs, so testing never appears as a separate line on a quote. Results come back within 1 week. Program members pay 10% to 20% less.
Buildings and projects
| Service | Typical trigger | What you get | List price |
|---|---|---|---|
| Baseline designated substance assessment | No record exists, building purchase, first subscription | Room-by-room register of all 11 substances plus PCBs, mould and ozone-depleting refrigerants, condition ratings, priority actions, floor-plan markup | $1,900–$6,500 by size |
| Annual reassessment | The 12-month update duty | Condition re-check of every listed material, updated register, change log, action list | $1,190 up to 25,000 sq ft; $1,780 for a rental up to 150 units |
| Project designated substance survey (DSS) | Renovation, repair, demolition, tender, demolition permit | Report on all 11 substances in the work area, ready to attach to tenders | $550 one suite or up to 2,000 sq ft; $1,300–$4,800 commercial |
| Pre-work desk review | Staff or a contractor is about to drill, cut or lift | Written answer from your register within 1 business day | $150 |
| Suite turnover check | A rental unit is about to be renovated | Site visit and a written result within 1 week | $660 |
| Management program | You have a register but no written program | Roles, work authorization, notices, training and response | $1,500–$4,000 |
| Abatement and remediation specifications | Asbestos, lead or mercury devices must be removed, repaired or enclosed | Scope of work, procedure type, quantities, bid review | $1,500–$5,000 |
| Abatement oversight and air monitoring | Type 2 or Type 3 asbestos work, lead removal | Daily inspections, background and perimeter air testing, daily reports | $1,100 a day |
| Type 3 clearance | Before a Type 3 enclosure comes down | Visual inspection, aggressive clearance air testing, clearance letter | $625–$900 a visit |
| Fallen or damaged material call-out | Water leak, ceiling collapse, damaged pipe lagging | Site visit, written isolation instructions on the spot, confirmed result within 1 week | $555 |
| Awareness training | Workers on or near listed materials | Live session for up to 15 staff, attendance records for the inspector | $750; $675 member rate |
Workplaces (O. Reg. 490/09)
| Service | Typical trigger | What you get | List price |
|---|---|---|---|
| Designated substance assessment | Substance used, handled or stored; new process; Ministry order | Written assessment prepared with your JHSC, stating whether exposure is likely and whether health may be affected | $2,500–$7,500 |
| Control program | Assessment shows health may be affected | Controls, work and hygiene practices, monitoring plan, records, training and medical surveillance links | $2,000–$5,000 |
| Exposure monitoring day | Program schedule, complaint, process change | A full day of personal and area air monitoring, results report, posting notice, JHSC copy | $1,400 a day |
| Respiratory protection program | Respirators in use | Written program, selection guidance, training records | $1,200–$2,500 |
Prices in CAD before HST. Ranges depend on building size or the number of processes; we confirm a fixed price before any work starts.
Common jobs
Asbestos testing before renovationWhat it involves, what it costs and how fast you get resultsDesignated substance survey for a demolition permitWhat it involves, what it costs and how fast you get resultsSilica exposure assessmentWhat it involves, what it costs and how fast you get resultsIsocyanate air monitoringWhat it involves, what it costs and how fast you get results
Not sure which service you need?
The Obligation Check points you to the right one, or send us the job details and we'll quote it.